Rhythm Wheel1 · Christian Kroschl
Back to basics.
Back to flow.
Control variability. Balance service, cost and cash.
APS and AI dominate the conversation. Planners still spend their days chasing orders, changing schedules and explaining excess stock. We need teams who understand the whole flow and know how to control variability.
During my Camelot years, we used these concepts at major pharmaceutical and consumer goods manufacturers. This pilot brings the Rhythm Wheel and its link to DDMRP buffers back into view. It honours Dr Josef Packowski and the Camelot team, alongside Carol Ptak, Chad Smith and the Demand Driven Institute for their work on DDMRP.
Manage variability from both sides
Stock keeps customers supplied between runs. The Rhythm Wheel gives production a steady rhythm and room to adjust. Both deal with the same changing demand. Design the cycle lengths and replenishment frequencies together with the stock buffers.
See how both sides work together →Design the buffers. Decide where fluctuations can be absorbed.
Design the rhythm. Choose cycle lengths and how often each product returns.
Keep parameters current. Use data and AI to test and maintain the rules.
One demand spike, two buffers
Follow one spike from customer orders to the production plan.
DDMRP stock buffer
Both products start at 100 units. At 55 units or below, DDMRP calls for a refill to 100.
Rhythm Wheel time buffer
The next cycle can make up to 70 units. If the requests exceed that, the deeper buffer gets capacity first.
Full simulation
Watch the explanationCustomer demand
Market orders
- Orders on this day
- Measured volatility
Red markers show the largest demand peaks in view.
Finished-goods stock
DDMRP stock buffer
All products
On handNet flow
- On hand
- Open supply
- Qualified demand
- Net flow
- Stock on hand
- Safety stock
The shaded area marks safety stock.
Rhythm Wheel
Run sequence and cycle limits
- CT min
- Current CT
- CT max
Upstream orders
What the supplier receives
One bar per order day
- Average order gap
- Gap variation
Order cadence over the full simulation.
Planned quantities replenish finished-goods stock
Service, cost and cash
Full 252-day run · selected strategy compared with reactive replenishment
Service
Cost
Cash
Read the colours as trade-offs. A red cost comparison or amber cash comparison can reflect a deliberate investment in more reliable service. Extra stock protects deliveries, while production flexibility and setup decisions affect cost. Judge service, cost and cash together.
How these values and colours are calculated
OTIF counts product-day entries with no outstanding demand. Green service meets the mini optimiser’s 90% OTIF floor. Red service falls below that floor. For cost, red means higher unit cost than reactive replenishment. For cash, amber means more capital tied up in stock. The business decision depends on the service gained for that investment.
Unit cost includes setup, material, inventory holding and disruption costs per shipped unit. Cash is average finished-goods inventory valued at the model’s product unit values. The comparison holds demand and the current model settings constant. Values use the simulation’s cost units.
Same demand, two plans
Results over 252 working days
| Metric | DDMRP + Rhythm Wheel | Reactive |
|---|---|---|
| Days without backlog | ||
| Average finished stock | ||
| Upstream order gap |
Design the Rhythm Wheel, results and mini optimiser
Design the tactical plan. Choose the cycle length, its allowed range and each product’s replenishment frequency. Use the forecast to size capacity and buffers. During execution, actual demand and DDMRP refill signals determine the quantities that fit this design. Each forecast change does not become a new production order.
A, B and C return every cycle. D can return less often. Longer gaps need more stock coverage. The pilot uses synthetic demand to demonstrate this relationship; it does not run a forecast-driven MRP explosion.
Stock coverage by product
Days without backlog
- Days without backlog
- Order gap
- Unit cost
- Disruptions
- Average stock
- Write-off
- Customer delay
Optimise settings
Compare cost, service and the lowest cost with at least 90% OTIF.
Related articles
All articles on the blog →
How the two buffers work together
DDMRP zones, factoring and the assumptions behind the simulation.
Decoupling and Synchronization
How buffers can make the supply chain more predictable.
Ongoing Debates About DDMRP and the Need of Forecasts
Where forecasts are useful in buffer and capacity design.