Rhythm Wheel1 · Christian Kroschl

Back to basics.
Back to flow.

Control variability. Balance service, cost and cash.

APS and AI dominate the conversation. Planners still spend their days chasing orders, changing schedules and explaining excess stock. We need teams who understand the whole flow and know how to control variability.

During my Camelot years, we used these concepts at major pharmaceutical and consumer goods manufacturers. This pilot brings the Rhythm Wheel and its link to DDMRP buffers back into view. It honours Dr Josef Packowski and the Camelot team, alongside Carol Ptak, Chad Smith and the Demand Driven Institute for their work on DDMRP.

One customer demand variability curve between two coordinated controls: Rhythm Wheel cycle-time flexibility on the left and a dynamic DDMRP stock buffer on the right.

Manage variability from both sides

Stock keeps customers supplied between runs. The Rhythm Wheel gives production a steady rhythm and room to adjust. Both deal with the same changing demand. Design the cycle lengths and replenishment frequencies together with the stock buffers.

See how both sides work together →

Design the buffers. Decide where fluctuations can be absorbed.

Design the rhythm. Choose cycle lengths and how often each product returns.

Keep parameters current. Use data and AI to test and maintain the rules.

One demand spike, two buffers

Follow one spike from customer orders to the production plan.

DDMRP stock buffer

Both products start at 100 units. At 55 units or below, DDMRP calls for a refill to 100.

Rhythm Wheel time buffer

The next cycle can make up to 70 units. If the requests exceed that, the deeper buffer gets capacity first.

Full simulation

Watch the explanation
Day 81 / 252

Drag the timeline to jump to any day.

Demand and replenishment signals move upstream

Customer demand

Market orders

Orders on this day
Measured volatility

Red markers show the largest demand peaks in view.

Finished-goods stock

DDMRP stock buffer

On handNet flow

On hand
Open supply
Qualified demand
Net flow

Rhythm Wheel

Run sequence and cycle limits

CT min
Current CT
CT max

Upstream orders

What the supplier receives

One bar per order day

Average order gap
Gap variation

Order cadence over the full simulation.

Planned quantities replenish finished-goods stock

Service, cost and cash

Full 252-day run · selected strategy compared with reactive replenishment

Service

Cost

Cash

Read the colours as trade-offs. A red cost comparison or amber cash comparison can reflect a deliberate investment in more reliable service. Extra stock protects deliveries, while production flexibility and setup decisions affect cost. Judge service, cost and cash together.

How these values and colours are calculated

OTIF counts product-day entries with no outstanding demand. Green service meets the mini optimiser’s 90% OTIF floor. Red service falls below that floor. For cost, red means higher unit cost than reactive replenishment. For cash, amber means more capital tied up in stock. The business decision depends on the service gained for that investment.

Unit cost includes setup, material, inventory holding and disruption costs per shipped unit. Cash is average finished-goods inventory valued at the model’s product unit values. The comparison holds demand and the current model settings constant. Values use the simulation’s cost units.

Same demand, two plans

Results over 252 working days

MetricDDMRP + Rhythm WheelReactive
Days without backlog
Average finished stock
Upstream order gap
Design the Rhythm Wheel, results and mini optimiser

Design the tactical plan. Choose the cycle length, its allowed range and each product’s replenishment frequency. Use the forecast to size capacity and buffers. During execution, actual demand and DDMRP refill signals determine the quantities that fit this design. Each forecast change does not become a new production order.

A, B and C return every cycle. D can return less often. Longer gaps need more stock coverage. The pilot uses synthetic demand to demonstrate this relationship; it does not run a forecast-driven MRP explosion.

Stock coverage by product

Days without backlog

Days without backlog
Order gap
Unit cost
Disruptions
Average stock
Write-off
Customer delay

Optimise settings

Compare cost, service and the lowest cost with at least 90% OTIF.

Related articles

All articles on the blog →

1 Related approaches use names such as Pattern Wheel, Production Wheel, Cyclic Production or Cyclical Production. Their detailed rules can differ. This pilot uses Rhythm Wheel for the approach developed during my Camelot years.

Historical references to Camelot describe Christian Kroschl’s experience. This independent educational project is not sponsored or endorsed by Camelot, Accenture or the Demand Driven Institute.