Rhythm Wheel1 · The thinking behind the pilot

Back to basics. Back to flow.

Technology keeps moving. The need to control variability stays.

I have spent much of my career working on the same problem. A forecast changes, the production plan moves, upstream requirements jump, and planners spend the day repairing the consequences. Service suffers. Costs rise. Stock accumulates in the wrong places.

Today the conversation centres on APS, AI and increasingly autonomous planning. My articles keep returning to what happens underneath those systems. Where do fluctuations enter the network? Where can they be absorbed? Who owns the rules, and who keeps the parameters aligned with reality?

What “back to basics” means here

It means deliberately positioning decoupling points, sizing stock buffers, setting workable production cycles and synchronising replenishment. Forecasts still help us anticipate demand and size capacity. Execution also needs rules that prevent every forecast adjustment from becoming a new production schedule.

The Rhythm Wheel makes that concrete. A finished-goods buffer serves the customer. Its replenishment signal travels upstream. A recurring production sequence provides a rhythm, while factoring adjusts which quantities fit between the cycle limits. The planned quantities then refill the buffer. Requirements that still exist are reconsidered at the next eligible cycle.

This is two-sided variability control. Inventory and production flexibility work together. Their settings determine the balance between service, cost and cash.

Designing the Rhythm Wheel is a tactical decision. Set the sequence, cycle lengths and replenishment frequencies, then size the stock needed between runs. The forecast supports that sizing. During execution, actual demand and buffer positions determine replenishment within the design. This keeps every forecast change from travelling through MRP and turning into new production orders, rescheduling and noise.

Why I am bringing this back

During my Camelot years, I worked with concepts applied at major pharmaceutical and consumer-goods manufacturers. They brought replenishment planning and scheduling together around a practical question. How much variability can the system absorb while keeping the line manageable and customer supply reliable?

This pilot is a homage to that body of work and to Dr Josef Packowski. It is also about skills. In the companies I work with, I see too much attention going to the next APS or AI initiative while the knowledge needed to design and run the supply chain receives too little attention. When experienced people leave or another transformation resets the process, useful operating knowledge can disappear with them.

A team can know its own planning screen and still miss what its decisions do upstream and downstream. Silos and local targets make that harder. We need people who can connect the concepts, the end-to-end process, the technology and the analytics. They need to understand why a buffer is there, how a production cycle is designed and what a parameter change does to service, cost and cash.

The pressure keeps growing. Disruptions and changing trade conditions add uncertainty. Customers still expect reliable deliveries. Cash and cost targets remain. Talent shortages, day-to-day firefighting and repeated change programmes leave little room to teach the underlying concepts. Bringing them back means making them understandable and giving teams the time and ownership to use them.

The DDMRP side of this pilot draws on the work of Carol Ptak, Chad Smith and the Demand Driven Institute. Their work on stock buffers and replenishment deserves recognition alongside the Camelot team’s work on the Rhythm Wheel.

That concern sits behind my writing on stabilization, decoupling and dynamic planning parameters. Read The Case for Stabilization →

The evidence behind the concern

The capability gap predates today’s AI discussion. In 2017, McKinsey described strong functional specialists alongside a shortage of people who could connect supply chain decisions, business requirements and digital solutions. It also found gaps in continued development for experienced staff. McKinsey, Digital supply chains: Do you have the skills to run them? →

The integration problem persists. Gartner’s April 2026 report, based on 140 senior supply chain leaders surveyed in late 2025, says 56% see integration with existing systems and processes as a major AI challenge. Half report limited internal expertise to implement and manage it. Gartner, Technology integration and talent →

The way people learn the job also needs attention. In a separate survey of 509 supply chain leaders, 55% expected agentic AI to reduce entry-level hiring needs. At the same time, 86% said new processes would be needed to develop future talent. These are expectations, but they raise a practical question: how will the next generation learn to make sound supply chain decisions? Gartner, Agentic AI and the talent pipeline, February 2026 →

Requirements remain demanding. Nine in ten respondents to McKinsey’s 2024 survey of 88 leaders encountered supply chain challenges. Two-thirds were investing in APS, yet 15% said implementations had missed business objectives. The survey records progress as well as remaining vulnerabilities. McKinsey, Supply chains: Still vulnerable →

These findings show persistent gaps in skills, integration and capability development. My concern is what happens when the technology programme gets more attention than the knowledge and operating rules needed to make it work.

Where AI can help

There is useful work for AI here. Detect changes in demand and lead times. Propose buffer profiles, replenishment frequencies and cycle limits. Test those settings against service, cost and cash. Explain the trade-offs. Feed actual execution results back into the next parameter review, with clear ownership of the decisions. Help teams understand and maintain the design.

The mini optimiser in this pilot is a small mathematical search that makes the trade-offs visible. It illustrates the kind of disciplined parameter work that more capable analytics and AI can help maintain at scale. The operating rules give those tools something meaningful to improve.

Explore the Rhythm Wheel →