How the two buffers work together
Customer demand changes every day. Production works better with a steady rhythm. The two buffers help manage that tension.
On the right, stock keeps customers supplied between production runs. On the left, the Rhythm Wheel keeps a repeating sequence, with room to adjust the cycle and quantities. Set both together so production can stay steady as demand changes.
Press Play, or point to a part of the diagram for an explanation.
Design the rhythm before running the plan
The Rhythm Wheel is a tactical plan you can design. Decide which products share a line, their sequence, the cycle length and how often each product returns. Replenishment frequency means the time between opportunities to make that product. Longer gaps need more stock to keep customers supplied.
Use the forecast to size capacity, cycle limits and stock buffers. During execution, actual demand and the buffer position generate refill needs. The Rhythm Wheel schedules those quantities within the agreed design. A forecast update does not pass straight through MRP and rewrite every production order. Review the design when demand or capacity changes enough to require it.
In the simulation, open Design the Rhythm Wheel to change the nominal cycle and D’s replenishment frequency. The cycle flexibility slider sets CT min and CT max. A, B and C return every cycle. Watch how D’s stock buffer changes when it is made less often.
What triggers a refill
The three time charts share the same 56-day window. The rightmost day is the one selected on the timeline. The stock chart shows one product at a time. The solid line is physical stock available to ship. The dashed line is the net flow position used to plan replenishment.
Net flow = on hand + open supply − qualified demand. Customer orders due today and earlier that remain after shipping are included. The simulation also includes known order spikes in the next three working days when their daily volume reaches half the red zone. Scheduled quantities count as open supply until they arrive, when they transfer into on-hand stock. On each simulated day, customer orders draw on opening stock. New receipts are posted before the next planning decision.
- Red combines base coverage, calculated as average daily usage × replenishment lead time × lead-time factor, with red safety, calculated as red base × variability factor.
- Yellow covers average daily usage over the replenishment lead time.
- Green is the largest of average daily usage over the order cycle, red base and the minimum lot.
At or below the top of yellow, DDMRP proposes enough to close the gap to the top of green. Average daily usage is updated from 28 days of demand. The opening history uses the expected product mix. In this simulation the planned replenishment lead time allows for the longest wait for a product’s slot, plus three days for release and transit. A longer cycle or less frequent slot can therefore increase the stock buffer.
What production can make
A, B and C have a slot every cycle. D is made less often if you choose a lower frequency. CT min is the shortest planned cycle; CT max is the longest. When there is little work, the line waits until CT min. Production and changeovers must fit within CT max.
By default, the product with the least physical stock relative to the top of red gets capacity first. This is an execution priority. The runs follow the established sequence. Model settings also offer proportional reduction. Both methods respect the minimum run size. At the next eligible cycle, any unplanned quantity is considered again as part of current net flow. New demand, stock and receipts determine the fresh refill signal.
Service, cost and cash
The three values describe the complete 252-day run. Service uses the model’s existing 90% OTIF floor. Cost compares unit cost with reactive replenishment under the same demand and settings. Cash compares average finished-goods inventory multiplied by the model’s product unit values. Higher inventory investment can support better service. Review the three values together when selecting parameters.
A red cost comparison means higher unit cost than the reactive plan. An amber cash comparison means more capital invested in stock. Both can be deliberate choices to protect deliveries and maintain a manageable production rhythm. The question is whether the service gained justifies the cost and inventory investment. Red service highlights OTIF below the model’s 90% floor.
How to read the comparison
The strategies face the same 252 working days of synthetic demand. The reactive strategy triggers from reorder points. The original Rhythm Wheel uses a coverage-based make-or-skip rule and lets work beyond CT max occupy the line. The strategy selector lets you inspect each plan.
- Days without backlog counts days on which no units are owed across all four products. Detailed OTIF counts product-day entries with no outstanding units.
- Average finished stock is the year’s mean on-hand inventory in days of reference demand.
- Upstream order gap is the average interval between packaging order days. Gap variation is the standard deviation relative to the mean.
The combined plan applies DDMRP and finite factoring at packaging. The two upstream stages retain the simplified replenishment rules. The simulation uses working-day snapshots, a repeating sequence, a simplified setup matrix and synthetic order spikes. The buffer-sizing and factoring choices demonstrate the planning mechanism. The simulation’s service and stock outcomes depend on those choices.
The mini optimiser in the model settings compares lowest unit cost, highest OTIF and lowest unit cost at 90% OTIF or above. In DDMRP mode it checks all 288 combinations of nominal cycle, cycle flexibility and product D’s frequency, using the selected variability factor and factoring method. The two legacy strategies use their original coarse search with refinement.
Acknowledgements and sources
DDMRP means demand driven MRP. Its foundation comes from the work of Carol Ptak, Chad Smith and the Demand Driven Institute. Their contribution to buffer design and replenishment deserves recognition.
This pilot brings those principles together with the Rhythm Wheel concepts from my Camelot years.1
- Demand Driven Institute, Demand Driven Material Requirements Planning
- SAP Help, Buffer Zones and Average Daily Usage (ADU)
- SAP Help, Net flow position and qualified order spikes
- Christian Kroschl, Shortening the Process With DDSCM
- Josef Packowski and David Francas, LEAN SCM: A paradigm shift in supply chain management
- Awi Federgruen and Ziv Katalan, The Stochastic Economic Lot Scheduling Problem: Cyclical Base-Stock Policies with Idle Times
- James A. Rappold and Keenan D. Yoho, Setting safety stocks for stable rotation cycle schedules
In memory of Dr Josef Packowski, whose work with the Camelot team shaped this approach to supply chain planning.